Post Tension Bridges March 19, 2022

26 July Axis Development Mariotyia Bridge

  • Client

    Engineering Authority of the Egyptian Armed Forces

  • Contractor

    GIECO (Gharably Integrated Engineering Co.)

  • Consultant

    EL Raeid Engineering Consultants

Back