Post Tension Bridges September 6, 2021

El Taamer Road Bridges (Stage-02)

  • Client

    Engineering Authorityof the Egyptian Armed Forces

  • Contractor

    GIECO (Gharably Integrated Engineering Co.)

  • Consultant

    EL Raeid Engineering Consultants

Back